The Brouwersdam is the seventh structure of the Delta Works. Brouwersdam forms a barrier across the former estuary known as the Brouwershavense Gat. As a result, the area of water became known as the Grevelingenmeer.ConstructionThe Grevelingendam between Goeree-Overflakkee and Schouwen-Duiveland was completed in 1965. The Gravelingen south of Goeree-Overflakkee were still connected to the North Sea. The storm surge could therefore be higher here, so dykes were raised on the south side of the island in 1965. Construction of the Brouwersdam was begun immediately after the Gavelingendam was completed in order to shorten the period of higher flood. After more than six years, in the spring of 1971, the dam was finished. Between 1964 and 1971 there had been some very high water levels. In November 1966 the water was just a few centimeters below the level of the infamous floods of February 1, 1953.Construction of the six-kilometer long dam was begun in 1962. The inlet between Goeree-Overflakke and Schouwen-Duiveland was 30 meters deep. As with other dams, caissons with holes were lowered, allowing the tides to go through during the construction of the dam. This avoided creating too strong a current in the narrowing gap. This method was used for the northern gap at De Kous.Besides the caissons for the Southern gap, the Brouwershavense Gat, a cableway was used. From the cableway, large blocks of concrete were dropped in the trench, on top of which sand was sprayed. This constructed two large sandbars. The local channel was too deep and the water flowed too fast for the caissons method. After all the caissons were lowered, all the gaps were plugged.
Voeg deze kaart toe aan uw website;
We gebruiken cookies en andere trackingtechnologieën om uw browse-ervaring op onze website te verbeteren, om u gepersonaliseerde inhoud en gerichte advertenties te laten zien, om ons websiteverkeer te analyseren en om te begrijpen waar onze bezoekers vandaan komen. Privacybeleid